What to Lock in a Purchase Order Besides Price
Price is one line. A purchase order also needs the spec, the term, the date, inspection rights, and the payment schedule.
A purchase order that only states a unit price and a quantity is a wish with a letterhead. The arguments that hurt importers live in the blank fields: which spec, which handover, when the balance is due, who may inspect, and what a late or short shipment costs. You can lock those points in two pages. The sequence from sample to order is outlined in samples, quotes, and purchase orders. This guide is the list of clauses that page still needs.
Spec, quantity, and what a unit is
Cite the spec revision from how to write a product spec. State the quantity and the unit, and say whether approved samples count toward that quantity. State whether the supplier may ship a little over or a little under, and the maximum variance you will accept without a new invoice conversation.
If there is a minimum order behind the number, write the minimum and the price breaks above it. What that minimum commits you to should be a decision you already made, not a surprise line on their proforma.
Handover, date, and delay
Name the Incoterm and the place. A bare FOB with no port is not a plan. Name a cargo-ready date and say that a slip has to be reported as soon as they know, not on the morning of the cutoff. Say whether you may cancel or reduce the order if the delay passes a number of days you choose, and whether materials already purchased are payable. Inventing that penalty during the delay is how relationships and shipments both stall.
Match this term to the booking reality in container timing. An order that ignores cutoffs will miss them.
Payment that follows documents
State the deposit, the balance, the currency, and the account name that must match the seller. State which papers must exist before the balance is due: a passed inspection, a draft invoice that matches the packing list, a draft transport document with the right consignee. Paying the balance against a cheerful email is how you give up leverage you meant to keep. The cautions in how you pay suppliers belong in this clause, not only in a finance memo.
Say who pays the inspection and who pays a re-inspection after a fail.
Quality, labels, and packing
Reserve the right to inspect in-line, at final, or at loading, whichever of those you actually intend to use. Say that a fail lets you hold shipment until you accept a sort, a rework, or a credit in writing. Point at the defect rule you gave the inspector.
Require the label revision you approved and the carton marks you specified. Substituting a material or a sub-supplier should need your written yes. Those two sentences prevent a large share of second-order disappointments.
Keep the signed copy
Ask the supplier to confirm the order in writing, even if their confirmation is a signed proforma that repeats your clauses. File it in the shipment folder before you pay the deposit. If their proforma deletes the inspection clause, that deletion is a no until you resolve it. A deposit sent against a document you did not read is consent.
On the reorder, start from this order and change only what changed. Do not rebuild a thinner PO because the first shipment happened to go well.
Frequently asked questions
Is a proforma invoice enough? Only if it carries the same clauses or clearly accepts your purchase order. A proforma that restates price and ignores inspection is not the full agreement.
Do I need a lawyer for a first small order? For a small, simple order, a clear two-page PO is much better than a verbal deal. For a large tooling commitment or a regulated product, have a qualified person review the terms. This guide is not that review.
What if the supplier will not sign? Treat continued production as their choice, and do not send the deposit until the open points are closed in email you can file. Silence plus a wire is the weakest contract of all.
Steps
- Cite the spec and the quantity: Name the revision, the unit of measure, and whether samples count toward the total.
- Name the Incoterm and the date: State the handover place and a cargo-ready date, plus what a slip requires the supplier to do.
- Write the payment schedule: Say the deposit, the balance, the currency, and which documents must exist before the balance moves.
- Reserve inspection and packing rules: Include who may inspect, what a fail allows, and which label and carton marks apply.
- State what happens if goods are short or late: Cover credits, cancellations before production, and who pays a re-inspection.