How to Compare Two Quotes That Do Not Match
Two supplier quotes rarely line up. Rebuild them on one sheet: price, term, tooling, packing, and what is missing.
Two quotes for the same product rarely arrive in the same shape. One is EXW and includes a mold. One is FOB and forgets the mold. One is in dollars per piece. One is in another currency per set of ten. Picking the smaller unit price is how you buy the wrong offer. Rebuild both on one grid before you reply to either supplier. The grid is dull. It is also the whole decision.
Force the same rows
Make a row for unit price, currency, quantity, what a unit contains, Incoterm and named place, lead time, and payment schedule. If a cell is blank, ask. Do not fill it with a guess and call the guess their offer. Red flags in a supplier email include numbers that will not sit still. Freeze a PDF version of each quote before you start the grid, so a later chat does not rewrite history.
Convert currency with a labeled rate and a date. A comparison that mixes currencies in your head is not a comparison.
Pull hidden lines into the open
Tooling, printing plates, samples, export paperwork, special packing, and inspection are the usual omissions. Put each on the grid as a number or as a written zero if they confirmed it is included. A blank is not a zero. Costs to confirm before a deposit is the same list, applied earlier here so the deposit is not the moment you notice the mold.
Ask whether the price holds for the spec revision you will actually order. A cheap quote on a thinner material is a quote for a different product. Cite the spec, using the habit in how to write a product spec.
Land them in the same destination
An EXW price and an FOB price cannot be subtracted from each other. Add the missing freight legs with help from a forwarder, and apply one duty assumption to both, including whether freight is in the duty base. The landed cost worksheet is the right format. If one supplier is a trader and one is a factory, note that too. How to tell them apart changes how much of the process you can see, which belongs beside the price even though it is not a currency.
Then judge the evidence
Add a row for sample status, inspection rights, and whether they named the producing factory. A slightly higher landed unit with a signed sample and an inspection clause can beat a lower unit you are not allowed to verify. That is a judgment. Make it after the numbers are honest, not instead of the numbers.
Look at cash as well as unit cost. The cheaper unit on a quantity you cannot fund is the more expensive quote this quarter. When a bigger order stops helping is the check on any break they used to win the grid.
Choose in one sentence
Write which quote you will accept and why, including the risk you are knowingly taking. Send a purchase order that copies the winning grid's terms, not a short email that says go ahead. File the losing quote too. When the winner tries to reopen a line, you will want both PDFs.
If neither grid produces a price you can sell, that is a result. Decline both. A comparison does not owe you a winner.
Frequently asked questions
What if one supplier will not break out tooling? Ask again once, then treat the quote as incomplete. You can still estimate a tooling number for your own sheet, labeled as yours, and you should not pretend they confirmed it.
Should I tell each supplier the other's price? You can negotiate without revealing a number you were not authorized to share. A specific target is enough. An auction built on forwarded PDFs can burn both relationships and your confidentiality.
How many quotes are enough? Two careful ones beat five messy ones. Add a third only if the first two grids disagree in a way you cannot explain.
Steps
- Put both offers on one grid: List unit price, currency, quantity, Incoterm, and lead time in the same rows.
- Add the missing lines: Tooling, samples, export documents, packing, and inspection should be numbers or an explicit zero.
- Rebuild landed cost: Use the same duty assumption and a freight quote that matches each handover point.
- Note quality evidence: Record who will make the goods, whether you may inspect, and which sample you are judging.
- Write the reason you choose: One sentence should say which quote wins and which risk you accepted.