Cost Lines to Confirm Before You Wire a Deposit
Before the deposit leaves, confirm product cost, tooling, freight, duty assumptions, inspection, and what the payment buys.
A deposit is the point where an estimate becomes your cash. After it leaves, you are negotiating from inside the order instead of from outside it. The evening before you wire is the right time to confirm a short list of cost lines, not to discover the freight assumption was a guess and the tooling was extra. You will not know every destination fee yet. You can know whether the sheet is honest enough to fund.
Separate the product from everything else
Confirm the unit price, the quantity, the currency, and what that price includes. Tooling, printing plates, samples, and export documents are the usual items that appear later as if they had been obvious. If they are extra, put them on their own lines now. If they are included, say so in the purchase order.
Check the minimum order one more time. A deposit calculated on a quantity you meant to renegotiate is a deposit on the larger number, as far as the supplier is concerned.
Put a freight and duty assumption in writing
You may not have a final freight invoice. You should have a quote, or you should label the freight row as unknown and large enough to scare you. Use the landed cost worksheet with that quote. Ask the broker whether the duty base includes freight, and note the answer from when freight sits inside duty.
If either number is a blank, do not tell yourself you will figure it out after production. Production does not create the missing quote. It only creates a deadline.
Inspection, labels, and the cost of being wrong
Add the inspection you plan to buy, and a possible re-inspection if you want a buffer. Add the cost of artwork and labels if the factory is not absorbing it. If the category might be restricted or might need a test, the cost of that test belongs on the sheet before the deposit, not as a surprise that makes you ship anyway because you have already paid. Restricted goods is the pause button for that question.
A buffer row is allowed. Label it as your buffer, not as a fee someone quoted. An unlabeled pad becomes fake precision.
What the deposit buys, and what it does not
Read the payment clause in the purchase order. Confirm the percentage, the account name, and the condition for the balance. Confirm you are not paying the full amount under a label that still says deposit. Match the method to the cautions in paying overseas suppliers.
A deposit should buy reserved materials or a production slot you can describe. If you cannot describe what you bought, ask before you send it. A wire is a terrible way to ask a clarifying question.
A ten-minute gate
The gate is a single page: product total, tooling, freight assumption, duty assumption, inspection, label or test costs, deposit amount, and the balance trigger. If a line is blank, the deposit waits. If every line is filled and the price you can charge still works, send the wire and file the page.
That page is also what you will compare with reality when the goods land. The gaps you find then are lessons. The gaps you ship with are choices.
Frequently asked questions
What if the supplier says the deposit is due today or the price changes? A real material move can be real. Ask which line changed and by how much, and update the sheet. A deadline that forbids you from reading the sheet is a reason to hesitate, not a reason to hurry.
Should I include my own travel or inspection travel? Yes, if you will actually spend it. A quality plan you cannot afford is not a plan. Put the trip on the sheet or choose a local inspector you can afford.
Is a small deposit always safe? It is safer than full prepayment, and it is still your money. A small deposit on a product you are not allowed to import is not conservative. It is a donation.